Silverado Hotel-Casino Project Advances with Clark County Filings
Sam Lehmann · Aug 26, 2026

Silverado Hotel-Casino Project Advances with Clark County Filings

Local developer Michael Ochoa has submitted plans to Clark County for the Silverado hotel-casino resort on a 13.5-acre parcel at the northwest corner of Las Vegas Boulevard and Richmar Avenue, and this location sits several miles south of the Las Vegas Strip. The filings detail a two-phase development that begins with core gaming and lodging elements while outlining future expansions that include additional rooms and structured parking.
Initial Development Phase
Phase one calls for 300 hotel rooms paired with a 57,000-square-foot casino floor, and the design incorporates multiple food-and-beverage outlets alongside spaces dedicated to entertainment and conferences. County records show these components form the foundation of the project, with the casino size positioned to support both table games and slot offerings within the initial footprint. The layout integrates these amenities on the same site to create a self-contained resort environment from the outset.
Expansion Plans for Subsequent Phases
A second phase would introduce 150 additional hotel rooms housed in two separate six-story buildings, and it also includes construction of a five-level parking garage to accommodate increased visitor volume. These additions build directly on the first phase infrastructure, allowing incremental growth as demand develops. Observers note that the phased approach aligns with standard practices for large-scale resort projects where initial operations inform later investments.
Site Context and Filing Details
The 13.5-acre site lies along a stretch of Las Vegas Boulevard that extends beyond the main Strip corridor, and the corner location at Richmar Avenue provides direct access from major roadways. Filings reference conceptual plans and drawings submitted to the county, yet no direct public link appears in initial coverage. Construction timelines remain unspecified in the current documents, though the project would mark a notable addition to southern Las Vegas gaming options once completed.

According to the submitted materials, the resort name Silverado appears consistently across both phases, and the developer has coordinated the filings to reflect a cohesive vision for the entire property. Data from the county process indicates standard review steps ahead, including zoning and permitting reviews that typically precede groundbreaking. Those who've tracked similar filings in the region recognize that such submissions often precede public hearings where additional details surface.
Key Project Components at a Glance
- 13.5-acre site positioned several miles south of the Las Vegas Strip
- Phase one: 300 rooms, 57,000-square-foot casino, food-and-beverage outlets, entertainment areas, and conference facilities
- Phase two: 150 extra rooms in two six-story buildings plus a five-level parking structure
- Developer: Michael Ochoa through Clark County filings
What's significant is how the project combines lodging, gaming, and support amenities on one parcel from day one, which allows for integrated operations without immediate reliance on off-site infrastructure. Researchers who study regional development patterns point out that projects of this scale frequently influence nearby commercial activity, although specific projections for this site await further county approvals.
Conclusion
The Silverado filing represents a concrete step toward expanding hotel-casino options along the southern Las Vegas corridor, and the detailed phase breakdown provides a clear roadmap for both initial operations and later growth. County records continue to serve as the primary source for updates as the review process moves forward, while the developer maintains the conceptual plans referenced in the original submission. Additional information may emerge once public comment periods open and more drawings become available for review.